FESCO Sargodha Industrial Sub-Division

FESCO Sargodha Industrial Sub-Division guide for factory owners and commercial enterprises. Industrial electricity connections, B2/B3 tariff information, high tension (HT) supply, and load management services for Sargodha Industrial Estate.

πŸ“ Address

Industrial Estate, Phase-1, Main Gate Road, Sargodha

πŸ“ž SDO Direct

048-3860201

🚨 Complaints

118 / 048-3860202

πŸ•’ Hours

Mon–Fri 8AM–4PM
Sat 8AM–1PM

8,500+
Consumers
18
Feeders
425+
Transformers
118
Helpline
Office Information & Contact Details
Office Address
Industrial Estate, Phase-1, Main Gate Road, Sargodha
SDO Office
048-3860201
Complaints
118 / 048-3860202
Working Hours
Monday - Friday: 8:00 AM - 4:00 PM, Saturday: 8:00 AM - 1:00 PM
🏒 About FESCO Sargodha Industrial Sub-Division
πŸ“‹ Practical guide β€” what to bring, what to do, and who to call

The FESCO Sargodha Industrial Sub-Division office at Industrial Estate Phase-1, Main Gate Road, is the dedicated electricity services office for factory owners, large commercial establishments, and industrial units in Sargodha District. If you own a flour mill, rice processing unit, cold storage, textile unit, or any business in the Industrial Estate Phase-I or Phase-II, your connection falls under this sub-division β€” not the City Sub-Division. The Industrial SDO handles 8,500+ consumer accounts on 18 dedicated feeders built to handle the high load demands of manufacturing operations.

Factory owners dealing with load enhancement applications β€” when adding new machinery or expanding production lines β€” must submit a written application to the SDO Industrial office with the technical specifications of the new equipment (load in kW, motor ratings, and power factor). The SDO then conducts a survey and submits the case to the FESCO XEN (Executive Engineer) Sargodha Division for approval. For HT (High Tension) 11kV consumers, the process involves additional safety inspection and protection relay settings verification β€” this is typically handled by the SDO's senior technical staff.

A very common issue reported by Sargodha industrial consumers is Power Factor penalty charges showing up on monthly bills. If your bill includes a PF penalty, it means your factory's average power factor is below the required 0.85 threshold. The solution is installing capacitor banks calibrated to your actual load β€” the SDO Industrial office can provide guidance on the required kVAR rating based on your consumption data. Many factories in the Industrial Estate have addressed this through local electrical contractors approved by FESCO.

For production loss compensation claims following extended outages due to FESCO infrastructure failure, you must file a written application at the SDO Industrial office within 15 days of the incident, attaching a production record showing the hours lost and estimated financial impact. These claims are processed through the FESCO Complaint Redressal mechanism and may require documentation from the XEN office. FESCO does not automatically compensate for outages β€” the formal written claim process is mandatory.

πŸ’‘

Pro Tip from Local Experience

Always call 118 first β€” it logs your complaint with a reference number and creates an official trail. Visit the SDO office in person only if the phone complaint is not resolved within 24 hours for faults, or 7 days for billing/connection issues.

FESCO Electricity Bill Calculator
Estimate your bill using 2026 NEPRA-approved domestic tariff slabs (A-1 category). Advanced calculator with commercial & agricultural tariffs β†’

2026 Domestic Tariff Slabs

1–100 unitsRs. 7.74/unit
101–200 unitsRs. 10.06/unit
201–300 unitsRs. 12.15/unit
301–700 unitsRs. 17.60/unit
700+ unitsRs. 22.65/unit

Enter your monthly units consumed and press Calculate to see the full bill breakdown.

Service Jurisdiction Areas
Areas covered under Sargodha Industrial Sub-Division
Sargodha Industrial Estate Phase-I
Sargodha Industrial Estate Phase-II
Small Industrial Estate
Dry Port Area
GT Road Industrial Zone
Lahore Road Commercial Area
Faisalabad Road Industries
Cold Storage Cluster
Flour Mills Belt
Rice Mills Area
New Connection Types & Fee Structure
Applicable fees for different connection categories
Connection TypeSanctioned LoadConnection FeeSecurity Deposit
Industrial B2 (LT)25-500 kWRs. 75,000 - 250,000Based on load
Industrial B3 (HT)500+ kWRs. 300,000+Based on contract demand
Commercial A25-50 kWRs. 35,000 - 75,000Rs. 15,000
Commercial A3 (HT)50+ kWRs. 100,000+Based on demand
Bulk SupplyAs per agreementNegotiatedBank Guarantee
Load Shedding Schedule (Approximate)
Schedules may change based on system demand and generation availability
FeederScheduled TimeDuration
Industrial Estate Main FeederExemptPriority Feeder
Small Industry Feeder2:00 PM - 4:00 PM2 hours
GT Road Commercial Feeder10:00 AM - 12:00 PM2 hours
Cold Storage FeederExempt (Peak Season)Priority
Emergency & Support Contacts
Industrial Emergency Line
048-3860202
24/7
SDO Industrial Direct
048-3860201
Office Hours
XEN Sargodha Division
048-3720115
Office Hours
FESCO Helpline
118
24/7
Complaint Registration Procedure
  1. 1For industrial faults, call dedicated line 048-3860202
  2. 2Provide your industrial consumer reference number
  3. 3Specify nature of fault (complete outage, phase failure, voltage issue)
  4. 4For HT consumers, contact XEN office for 11kV faults
  5. 5Production loss claims require written application with documentation
  6. 6Regular maintenance requests should be submitted in writing to SDO
Nearby FESCO Offices
FESCO Sargodha City Sub-Division
Distance: 4.5 km
048-3720119
FESCO Circle Office Sargodha
Distance: 5 km
048-3720118
FESCO Shahpur Sub-Division
Distance: 35 km
048-6630212
Available Services at Sargodha Industrial Office
New industrial connections (B2, B3 categories)
High Tension (11kV) supply applications
Load enhancement and reduction requests
Sanctioned load certificates for industries
Power factor improvement consultation
Tariff category change applications
Temporary industrial supply for construction
Net metering for industrial solar installations
Time of Use (ToU) meter installations
Industrial transformer maintenance